Five steps, no guesswork — you always know exactly what comes next. Tap a step to see what it involves.
12345
You pay securely. Payment is confirmed instantly, and your receipt with the written fee breakup lands in your inbox.
Is a factory license the right requirement for your business?
You need a factory license if any of these fit:
You carry on a manufacturing process — making, altering, repairing, finishing, packing, or treating any article or substance — with 10 or more workers on any day of the preceding twelve months, using power.
The same, but without power, with 20 or more workers. Power means electrical energy or any mechanically transmitted energy, not human or animal energy.
Your state has declared your type of premises a factory by notification under Section 85 — this has been used for power looms, rice and oil mills, saw mills, and chemical units using hazardous processes.
You are setting up a new manufacturing unit and will cross the threshold once production starts — the plan approval stage begins before construction, not after.
You probably do not need this license if:
You run a shop, office, warehouse, or commercial establishment with no manufacturing process — those take Shops and Establishment registration, not a factory license. (See the dedicated section below.)
Your manufacturing unit employs fewer than 10 workers with power, or fewer than 20 without, and your state has not notified your industry under Section 85.
You are a pure logistics or transport operation moving goods without any manufacturing process on the premises.
You carry on a manufacturing process but only with family members in a purely domestic setting — though this is a narrow reading and state practice varies, so confirm before relying on it.
What must be decided before applying
Who is the occupier. This is the single most consequential decision on the application. The occupier is the person with ultimate control over the factory's affairs — in a company, one of the directors; in a firm, one of the partners. The occupier is personally liable for violations under Section 92. Choose someone who will actually supervise compliance, not a name on paper, because the liability follows the designation.
Who is the manager. The Act requires a manager for the factory's purposes, named in the Section 7 notice. The manager handles day-to-day compliance; the occupier carries the legal responsibility. Both names must be correct from the start, and changes must be notified.
The site and the plans. Factory plans — layout, machinery placement, worker amenities — must be submitted to the Chief Inspector for approval before construction or extension. If you have already built, the plans are still submitted and regularized through the same channel, but expect scrutiny. A stability certificate in the prescribed form, signed by a competent person, accompanies the plans.
Power and headcount arithmetic. Count everyone: direct employees, contract workers, and anyone employed in the manufacturing process or work incidental to it, whether for wages or not. The threshold looks back over the preceding twelve months — a single day at or above the number is enough. Seasonal spikes count.
Advantages of holding a proper factory license
Legal operation, full stop
A licensed factory cannot be shut down for want of a license. In industrial areas, enforcement drives periodically sweep unlicensed units; a valid license ends the conversation before it starts. Banks, too, ask for it — term loans for plant and machinery routinely require the factory license as part of the documentation.
Government tenders and large buyers open up
Public-sector tenders and large private buyers increasingly require proof of statutory compliance from vendors. A factory license, with the inspection history behind it, is the baseline credential that puts a manufacturing unit on approved-vendor lists.
Worker welfare infrastructure that reduces attrition
The Act's welfare provisions — drinking water, latrines, washing facilities, canteens above the threshold, rest rooms, creches where applicable — are not just compliance costs. Units that run them properly see measurably lower attrition and fewer disputes, because the basics of dignity at work are covered by design.
Working-hours discipline that survives disputes
The Act's framework for working hours, weekly holidays, overtime at double rates, and leave with wages gives both sides a clear rulebook. When a wage dispute reaches a labour court, the factory that kept the prescribed registers and paid overtime correctly is in a fundamentally stronger position than one that ran on memory.
Safety compliance that limits catastrophic liability
The general duties of the occupier, the hazardous-process provisions added in 1987, and the inspection regime exist because factories can kill people. Compliance — fencing machinery, maintaining pressure vessels, training workers — is the difference between an accident and a criminal prosecution for one. The license is the entry point to that system.
Hazardous-process clearance as a business asset
For units in hazardous processes, the site appraisal committee clearance and the detailed compliance framework become a durable asset — they are prerequisites for environmental consents and are scrutinized in any acquisition due diligence. Getting them right early avoids the retrofitting costs that buyers discount for.
A clean record for the OSHWC transition
When the OSHWC Code is notified in your state, existing licensees migrate under repeal-and-savings provisions. Units with valid licenses and clean inspection records will move across with the least friction; unlicensed or lapsed units will face the new regime's penalties without the benefit of continuity.
Documents required for a factory license
Identity and constitution. PAN of the business, incorporation or registration documents, and the occupier's identity and address proof. For companies, the board resolution naming the occupier-director.
Site and ownership. Proof of ownership or lease of the premises, and the owner's details as required in the Section 7 notice. If the premises are leased, the lease deed with adequate tenure.
Plans and technical certificates. Factory plans in the prescribed format, the stability certificate signed by a competent person, and details of the manufacturing process, installed horsepower, and machinery layout.
People. The occupier's particulars, the manager's appointment details, and the projected worker count. Where contract workers will be engaged, the contractor's details for the CLRA interplay.
Fee payment. The treasury challan or online payment receipt for the prescribed fee, which is computed on the state's fee schedule — typically linked to installed horsepower and the number of workers.
Factory license process — step by step
Step 1: Threshold confirmation and occupier designation
Confirm the unit meets the Section 2(m) definition — manufacturing process, worker count, power position. Designate the occupier and the manager, and pass the board resolution or partnership decision recording it.
Step 2: Plan approval application
Submit the factory plans and specifications to the Chief Inspector (or the State Government, as the state rules require) for the site and for construction or extension. The application goes by the prescribed mode; if no order is communicated within three months of sending it by registered post, permission is deemed granted under Section 6(2). A refusal can be appealed within thirty days.
Step 3: Stability certificate
Obtain the certificate of stability in the prescribed form from a competent person in respect of the engineering construction, and file it with the plan approval. This is not a formality — it is the document the inspector relies on for structural safety.
Step 4: Section 7 notice in Form 2
At least fifteen days before beginning to occupy or use the premises as a factory, the occupier sends written notice to the Chief Inspector in Form 2, containing the factory's name and situation, the occupier's and owner's details, the communication address, the nature of the manufacturing process, the installed horsepower, the manager's name, and the likely worker count.
Step 5: License application in Form 3
File the application for grant of license in Form 3 with the prescribed fee. In most states this runs on the labour department's online portal alongside the Form 2 notice.
Step 6: Inspection
The Factory Inspector visits the premises — examining the plant, machinery, safety arrangements, welfare facilities, and records — and verifies the application particulars. Deficiencies are communicated for rectification.
Step 7: Grant of license
On satisfaction, the Chief Inspector grants the license. Display it prominently at the factory — it must be available for inspection at all times.
How long does it take?
Plan approval is the long pole: 30 to 90 days depending on the state and the completeness of the plans. The deemed-permission provision at three months is a backstop, not a strategy — most states process faster when the file is complete. Once plans are approved and the Form 2/Form 3 applications are filed with the 15-day notice, license issuance typically follows within 30 to 45 days, subject to inspection scheduling. A realistic end-to-end timeline for a new factory is three to five months; renewals and amendments are measured in weeks.
Government fees
Fees are prescribed by each state's Factory Rules and are typically computed on two axes: the total installed horsepower and the maximum number of workers employed. The schedule usually has slabs — for example, separate fee bands for units up to 50 HP, 50–100 HP, and above, crossed with worker-count bands. Amendment and renewal fees are lower than the first grant. Always check the current fee table on your state's labour department portal before filing, because states revise these periodically and the online calculator is the authoritative figure.
Factory license vs Shops & Establishment registration — the confusion, cleared
This is the most common wrong turn in this area, so it gets its own section. Prospects search for both terms, and many businesses need exactly one of them.
The legal boundary. The Factories Act applies to premises where a manufacturing process is carried on and the worker threshold is met. The Shops and Establishments Acts (state legislation, e.g. the Delhi Shops and Establishments Act, 1954) apply to shops, commercial establishments, and offices — places where no manufacturing process is carried on. Manufacturing is the dividing line, not the size of the signboard.
What counts as a manufacturing process. Section 2(k) defines it broadly: making, altering, repairing, ornamenting, finishing, packing, oiling, washing, cleaning, breaking up, demolishing, or otherwise treating or adapting any article or substance; pumping oil, water or sewage; generating or transmitting power; printing; ship-breaking; and preserving articles in cold storage. If your unit does any of these with the threshold headcount, it is a factory.
The practical rule of thumb. If goods are made, assembled, processed, packed, or repaired on the premises with 10+ workers (power) or 20+ (no power) — factory license. If the premises only sell, store, distribute, or administer — Shops and Establishment registration. A manufacturing unit's head office or a standalone warehouse generally takes the Shops Act registration, while the plant itself takes the factory license.
Can a unit need both? Generally no for the same premises — the regimes are designed to be mutually exclusive by the nature of the activity. But a business commonly holds both across locations: the factory license for the plant, Shops Act registrations for the offices, depots, and retail outlets. Each premises is assessed on its own activity.
The cost of getting it wrong. A factory operating on a Shops Act registration alone is an unlicensed factory — Section 92 prosecution territory. A shop that obtained a factory license it never needed has signed up for factory inspections, registers, and returns for no benefit. When in doubt, the manufacturing-process test decides.
Contract workers and the CLRA interplay
Contract workers count toward the factory threshold — Section 2(l) expressly includes persons employed through a contractor in the definition of worker. So a unit with 8 direct employees and 4 contract workers using power is a factory.
Beyond headcount, the Contract Labour (Regulation and Abolition) Act, 1970 runs in parallel wherever 20 or more contract workers are engaged (some states have raised this to 50). The principal employer registers in Form I; each contractor takes a license in Form V. The factory's occupier must ensure contractors hold valid licenses, because wage defaults by the contractor fall back on the principal employer. Under the OSHWC Code, 2020, the CLRA threshold rises to 50 and a common-license concept will let one license cover the factory operation and contract-labour engagement together — but until the Code is notified in your state, the existing two-track system applies.
What happens after the license arrives
In the first 30 days: display the license prominently at the factory. Open the prescribed registers — attendance, wages, overtime, leave — and set up the notice boards the Act requires (abstracts of the Act, weekly holiday notices, working-hour notices). Appoint the welfare officer if the threshold applies.
In the first 6 months: the first inspection often comes early for new licenses. Keep the registers current from day one — inspectors check backdated completeness. File the first returns due in this window, and ensure the manager and occupier details on record match reality.
The recurring compliance you are signing up for
License renewal. Factory licenses are granted for a fixed term — commonly one year, with some states offering longer — and must be renewed before expiry with the prescribed fee. Operating on an expired license is treated as operating without one.
Annual and half-yearly returns. The state Factory Rules prescribe returns on employment, working hours, leave, accidents, and dangerous occurrences. Deadlines cluster around the calendar year-end; missing them draws notices.
Registers, maintained daily. Attendance, wages, overtime, leave with wages, and accident registers must be kept current and produced on demand. The register discipline is what inspectors actually examine.
On change. Any change in the occupier, the manager, the manufacturing process, the installed horsepower, or the worker strength beyond the licensed figures must be notified, with amendment of the license where the rules require it.
Common mistakes and how to avoid them
Starting construction before plan approval. The Act requires previous permission for the site and for construction or extension. Building first and seeking approval later converts a routine file into a regularization problem.
Undercounting workers. Excluding contract workers, trainees, or "temporary" staff from the headcount is the most common threshold error. The definition is deliberately wide — count everyone connected with the manufacturing process.
Naming the wrong occupier. A director who has no operational involvement, or a person who has left the company, named as occupier creates a liability mismatch. The occupier must be someone with actual control who can answer for compliance.
Letting the license lapse. Renewal is calendar-driven and easy to miss in a busy plant. A lapsed license means the factory is unlicensed from the expiry date — diarise the renewal ninety days out.
Treating the Shops Act registration as a substitute. As the section above explains, these are different regimes. A factory needs its factory license regardless of any other registration the business holds.
Penalties that actually bite
Section 92 makes contravention of the Act punishable with imprisonment up to two years, a fine up to ₹1 lakh, or both. The liability falls on the occupier and, where applicable, the manager. Specific provisions carry their own penalties — obstructing an inspector, failing to maintain registers, or employing workers in contravention of the working-hours and leave provisions each attract prosecution. Beyond the Act itself, an unlicensed factory cannot obtain or retain pollution consents, fire NOCs, or power-load enhancements, so the license is a gating document for the entire industrial compliance stack.
License types compared
License
For
Authority
Key test
Factory license
Manufacturing premises
Chief Inspector of Factories
10+ workers with power / 20+ without
Shops & Establishment
Shops, offices, commercial establishments
Labour department / municipal body
No manufacturing process
CLRA principal employer registration
Engaging contract labour
Labour department
20+ contract workers (50 under OSHWC)
Contractor license (CLRA)
Supplying contract labour
Labour department
Per-contractor, per-establishment
OSHWC registration (future)
Establishments under the Code
Notified authority
10+ workers; single registration
How ComplyKart helps in this entire process
Threshold assessment. We apply the Section 2(m) test to your actual operations — manufacturing process, power position, headcount including contract workers — and tell you plainly whether you need a factory license, a Shops Act registration, or both across your locations.
Occupier and manager structuring. We advise on who should be named occupier and manager given the liability position, and prepare the board resolutions and appointment documents.
Plan approval filing. We prepare the factory plans package, coordinate the stability certificate from a competent person, and file for site and construction approval with the Chief Inspector's office.
Form 2 and Form 3 filing. We draft the Section 7 notice, compile the application file, pay the state-notified fee, and file on the labour department portal.
Inspection readiness. We brief the plant team on what the Factory Inspector examines — safety, welfare, registers, notices — and run a pre-inspection review so deficiencies are fixed before the visit, not after.
Renewals and amendments. We diary your renewal, handle the annual filing, and process amendments for changes in occupier, horsepower, or worker strength.
What we do not do: we cannot influence the inspector's findings, guarantee a timeline (inspection scheduling is the authority's prerogative), or help anyone operate an unlicensed factory.
Sources
This page is built on the Factories Act, 1948 (particularly Sections 2, 6, 7, 85 and 92), the state Factory Rules (forms, fee schedules and return formats), the Occupational Safety, Health and Working Conditions Code, 2020 and the OSHWC (Central) Rules, 2026, the PIB explainer on the Code's factory-threshold changes, and state labour department portals and FAQs (including the Delhi Labour Department's notice-of-occupation guidance). Fee figures and portal procedures are state-specific and change periodically — we verify the current position for your state at the time of engagement.
FAQ
Frequently asked questions
19 answers from our consultants.
You pay for our expert's time — document checking, filing, follow-ups — not the government. The government fee goes to the government; our fee is for the work we do so you don't have to figure it out yourself.
Tell us your situation in plain words — what you're trying to do, not which form you think you need. Half our job is stopping clients from buying the wrong service. The first consultation is free and honest.
Yes. We quote professional fee + government charges + taxes separately, in writing, before you pay. The number doesn't change midway. If the government fee changes, we show you the notification.
The occupier is the person with ultimate control over the factory's affairs — one of the directors in a company, one of the partners in a firm (Section 2(n)). It matters because the occupier is personally liable for violations under Section 92, gives the Section 7 notice, and holds the license. Choose someone operationally involved, not a convenient name.
Form 2 is the occupier's notice and registration — the Section 7 intimation sent at least 15 days before the premises start operating as a factory. Form 3 is the application for grant of the license itself. In practice both are filed together on the state portal, with the fee.
Yes. Section 6 requires previous permission in writing for the site and for construction or extension of the factory, with plans and specifications submitted to the Chief Inspector or State Government. If no order is communicated within three months of sending the application by registered post, permission is deemed granted — but plan your timeline around approval, not the deeming provision.
A certificate in the prescribed form (Form 1-A in several states) signed by a competent person, certifying the structural stability of the factory building. It accompanies the plan approval application and is the document the inspector relies on for the engineering safety of the construction.
Each state's Factory Rules prescribe a fee schedule, typically computed on installed horsepower crossed with the maximum number of workers — slab-wise bands for both. Amendment and renewal fees are lower. The state portal's fee calculator is the authoritative figure; confirm the current schedule before filing.
Yes. The application requires proof of the right to occupy — a registered lease deed of adequate tenure — along with the owner's details as required in the Section 7 notice. The license is premises-specific; shifting the factory needs a fresh process for the new site.
The inspector examines the premises, plant and machinery, safety arrangements (fencing, pressure vessels, fire provisions), welfare facilities (drinking water, latrines, washing, canteen where applicable), the statutory notices on display, and the registers. Deficiencies are communicated in writing for rectification before the license is granted.
Assembly is a manufacturing process under Section 2(k) — "adapting" and "finishing" articles are expressly included. If the headcount threshold is met, an assembly unit needs a factory license regardless of how simple the assembly is.
Begin the plan-approval stage as soon as growth plans make crossing the threshold likely — plan approval precedes construction, and the 15-day notice precedes occupation. Applying after you have already crossed the threshold with workers on the floor means operating unlicensed in the interim.
The state Factory Rules prescribe registers for attendance, wages, overtime, leave with wages, and accidents, among others. They must be maintained currently and produced on demand during inspection. Backdated or reconstructed registers are treated as non-maintenance.
Section 85 lets the State Government declare any premises a factory by notification, even below the normal threshold — historically used for power looms, rice and oil mills, saw mills, and chemical units with hazardous processes. If your industry has such a notification in your state, the threshold does not protect you. Check before concluding you are outside the Act.
Three main changes: the threshold rises to 20 workers with power and 40 without; plan permission is deemed granted in 30 days; and a common-license concept will let one license cover factory operation, contract labour, and inter-state migrant workers. But none of this applies until the Code is notified in your state — until then, the 1948 Act governs.
Section 6(3) gives you thirty days from the refusal to appeal — to the Central Government if the State Government refused, to the State Government if the Chief Inspector refused. Address the stated grounds and re-file; most refusals relate to plan deficiencies that can be corrected.
It depends on how the state treats the premises — contiguous buildings under one management with a unified manufacturing process are typically covered by one license, while distinct processes or separately managed units may need separate licenses. The Chief Inspector's office decides on the facts; confirm at the plan-approval stage.
Drinking water, latrines and urinals, washing facilities, and first-aid are baseline. Larger thresholds trigger more: rest rooms and lunch rooms, canteens (250+ workers), creches (30+ women workers), and welfare officers (500+ workers). The exact numbers are in the Act and state rules — design the plant layout around them from the start.
Obstruction is itself an offence under the Act, punishable separately from the underlying violation. Cooperate, produce the registers demanded, and contest findings through the proper channels — the inspector's powers of entry, examination, and inquiry under Section 9 are wide, and resisting them only adds charges.
What clients say about working with us
Real stories from businesses we've worked with.
Trademark Registration“
Our Trademark was applied in all the classes with a short span of time by Complykart Trademark Experts and I can say the level of expertise and commitment they carry is remarkable. It's an A+ from my side. We are now sticking to ComplyKart only.
Company Registration“
I found the professionalism of the staff at complykart.com, a pleasure to work with. As a foreigner to India, they took the time to explain the documentation and assisted in every question I raised. I was pleased that complykart.com made it easy for my Business.
Merger & Acquisition“
Trust, Commitment, Dedication and responsiveness are the best things with ComplyKart. Thanks for handling our Merger assignment with so much care. After my business disputes, complykart handles all things with own sense of understanding.
Company Law Specialist · Company Law & ROC Compliance · 10+ years experience
Naman Agarwal specialises in company law and ROC compliance. He manages incorporations, annual filings (AOC-4, MGT-7, ADT-1), board processes and statutory registers for private limited companies, LLPs and Section 8 companies.
Last reviewed: 16 November 2026